Phase 3
Home Interests Old Photos Teardrop

Phase 1 Phase 2 Phase 3 Phase 4 Phase 5

 
dec05-01.jpg (28968 bytes) dec05-02.jpg (24133 bytes) dec05-03.jpg (15217 bytes)
12-5 Galley cabinets and speaker boxes for stereo... 12-5 Frame for Coleman cooler with 100# full extension drawer slides 12-5 Shelf for stereo and 12V accessory plug for TV
 
dec12-01.jpg (16772 bytes) dec12-02.jpg (43880 bytes) dec12-03.jpg (61180 bytes)
12-12 Second shelf added for blankets & pillows, etc. 12-12 Frame completed with 1" angle iron for bottom support... 12-12 Galley shelves for camping essentials...
     
dec12-04.jpg (61972 bytes) dec12-05.jpg (62943 bytes) dec12-06.jpg (46391 bytes)
12-12 Masonite skin is attached w/PL adhesive & 1" brads 12-12 Opposite side shot... 12-12 Full rear shot...
     
Jan02^02.jpg (45341 bytes) Jan02^03.jpg (47428 bytes) Jan02^04.jpg (29257 bytes)
1-2-05 Attaching frame for Hatch to Masonite 1-2-05 Hatch glued & screwed & tatooed, with 1" brads... 1-02-05 Perfect fit. Quite a task. Now to get the props positioned...
 
Jan16-03.jpg (38195 bytes) Jan16-04.jpg (47355 bytes) Jan23^01.jpg (80510 bytes)
1-16  Drawers complete... 1-16 Galley 98% completed... 1-23  First coat of waterproof varnish, 2 more to be applied w/spar
 
Feb20^03.jpg (77947 bytes) Feb27^01.jpg (74164 bytes) Mar13^01.jpg (64191 bytes)
2-19 Metal sides cut & installed... 2-27 Center skin installed, waiting on edge trim to attach for final... 3-12 Edge trim installed with help from J. Riffe

Phase 1 Phase 2 Phase 3 Phase 4 Phase 5

 

 

 

 

Copyright © 2008 Jack-Shack, Inc.   |   All Rights Reserved   |   Site by The Cyber Shack   |  Photo Gallery Login  |   Webmail